Skip to main content
EIP Insight

Research documentation explorer

Lane 2
Research narrative

Methodology, instrument, and progress

A presentation-ready view for supervisors, examiners, and collaborators reviewing what the study asks, why the two phases fit together, and how response collection is progressing.

Study at a glance
English only
Formulation of an optimal Eco-Industrial Park Model for the South Asian Region — identifying barriers, potentials and best practices.
Status: Phase 1 data collection in progress. Phase 3 is prepared for the stakeholder instrument lane.
Candidate
H.G.T.P Samarawickrama (Ph.D Student)
Supervisors
Candidate to confirm
Institution
University of Sri Jayewardenepura · Tel 0112 801 604 ext 8484
Study period
2025-2027 (candidate to confirm)
Ethics reference
ERC-HSS/FGS/2025/09/03

Candidate-authored

Research question and framework

Research Question And Conceptual Framework

This section is reserved for the candidate-authored research question and framework narrative. It should explain the study problem, the Eco-Industrial Park concepts being tested, and how the two survey phases connect to the thesis model.

What This Section Should Cover

  • The central research question and supporting objectives.
  • The conceptual framework or model being evaluated.
  • The role of barriers, potentials, best practices, and stakeholder evidence in the study design.
  • Any definitions supervisors or examiners need before interpreting the survey instruments.

Canonical instrument

Two-phase survey design

Phase 1
~12 min
Phase 1 — Industry Profile
Data collection on socio-economic, environmental and industrial background of industries in South Asia.
Questions
39
Completed
Loading
In progress
Loading

Started rows: Loading

A. Industry profileB. Socio-economicC. EnvironmentalD. Industrial backgroundE. Material flow analysisF. Priority comparisons (AHP, Saaty 1–9)G. Supporting documentsH. Contact & authorization
Phase 3
~18 min
Phase 3 — Detailed Eco-Industrial Park Survey
Survey on renewable energy, circular economy and industrial symbiosis opportunities for South Asian eco-industrial parks.
Questions
51
Completed
Loading
In progress
Loading

Started rows: Loading

Respondent informationA. General & geographical dataB. Renewable energy (RE)C. Circular economy (CE)D. Industrial symbiosis (IS)E. Triple bottom line (TBL)F. Enablers & supportG. Data sharing & follow-upsH. Documents, contact & authorization

Participant pathway

The flow keeps consent, optional resume, final submission, and aggregate analysis separate.

flowchart LR
    Land["Lands on /"] --> Pick["Picks a survey phase"]
    Pick --> Consent["Reads consent"]
    Consent -->|Agrees| Survey["Answers survey questions"]
    Consent -->|Declines| Exit["Exits"]
    Survey --> Save["Optional save and resume"]
    Save -->|Resume token sent| Resume["Returns via /r/$token"]
    Resume --> Survey
    Survey --> Submit["Final submit"]
    Submit --> Store[("Supabase responses")]
    Store --> Aggregate["Aggregate counts for analysis"]

Candidate-authored

Sampling, ethics, and consent

Sampling, Ethics, And Consent

This section is reserved for the candidate-authored sampling and ethics narrative. It should describe who is being recruited, why those participant groups are appropriate, how recruitment is managed, and how consent and privacy are protected.

Sampling Frame

Describe the industries, agencies, and stakeholder groups included in the study, plus any inclusion or exclusion criteria.

Recruitment Channels

Describe the approved recruitment approach, including direct invitations, professional networks, institutional contacts, or other channels.

Ethics And Consent

The survey uses the shared consent items from the canonical instrument source. Include the final ethics approval reference, consent process, data-retention notes, and any limits on identifiable contact details.

Progress
Milestones
Candidate-editable timeline stored in milestones.json.
  1. Proposal defended

    Nov 1, 2025

    Done
  2. Phase 1 instrument finalised

    Mar 15, 2026

    Done
  3. Phase 1 data collection mid-point

    May 26, 2026

    In progress
  4. Phase 3 launch

    Aug 1, 2026

    Upcoming